One of the first floating solar systems in Malaysia utilising flotation devices on a pond (i.e. floating solar power plant).
For locality factor, CPSB has identified a 75-acre of decommissioned mining pond at Pantai Remis, Perak as the proposed floating LSSPV project site. The decommissioned mining pond is neighbouring the Segari gas power plant. CPSB has subsequently been awarded the 9.99Mwac project directly by the EC in 2018. This LSSPV is CPSB’s first foray into the power sector while it continues to identify other business opportunities in renewable energy.